Construction
Where Construction Debris Actually Goes Around Dearborn
Every municipal route in this city excludes construction material outright. That single fact shapes every renovation budget here.

The rule that shapes everything
One line from the City's own guidance does more to shape renovation budgets in Dearborn than anything else:
Not limited. Not charged. Not accepted.
So the moment a project stops producing furniture and starts producing drywall, plaster, tile, timber, cabinetry, roofing or flooring, every free municipal route closes at once. There is no cap to work within and no fee to pay — the material simply has to go somewhere else.
Why the municipal routes cannot help
Worth walking through, because people reasonably assume there must be a way.
Curbside bulk collection takes household bulk — five items a week, twenty a year. A bathroom vanity is not a bulk item; it is construction debris, regardless of being furniture-shaped.
The DPW Yard on the third Saturday takes residential bulk waste, and explicitly not construction material. It also, since March 2019, turns away commercial trucks, rental trucks and utility or landscape trailers — so even if the material were eligible, most ways of transporting it are not. Full detail here.
Yard waste collection takes green waste in season, under a sticker, under 35 pounds a bag. Not timber offcuts and certainly not treated wood.
Recycling takes household recyclables under the City's mandatory ordinance. Not construction debris.
That is the whole municipal system, and none of it is a route for a renovation. Which is not a criticism — those services are built for households, and construction debris is a commercial waste stream that has always been handled commercially.
The five streams worth separating
Separation costs a little organisation and saves real money, because clean single-material loads dispose more cheaply than mixed debris.
1. Clean concrete, brick, block and asphalt
Rebar is generally fine; timber, plastic and general rubbish are not. Its own 10 yard, part-filled. On a demolition job this is usually the single largest tonnage and the biggest saving available.
2. Scrap metal
Ductwork, water heaters, structural steel, rebar offcuts, fencing, appliances and — in the pre-war housing across the older cities — cast iron plumbing, which is heavy and genuinely valuable. Positive value rather than a disposal cost.
3. Clean untreated wood and green waste
Framing offcuts, brush and prunings. Keep it clean: one treated fence post changes what the load is.
4. Cardboard and packaging
New-build and fit-out work generates it in enormous volume and it fills a container faster than anything else on site. Flattening it is the cheapest volume saving available anywhere.
5. Everything else
Mixed C&D — drywall, plaster, flooring, cabinetry, insulation, roofing. This is the bulk of most renovations and it goes as mixed debris.
Plaster and concrete: the weight traps
Concrete runs around two tons per cubic yard. Slab, footings, driveway, patio, steps and brick all belong in a 10 yard, part-filled. A large container of concrete is unhaulable long before it looks full.
Plaster and lath is the local one, and it catches people constantly. Across the pre-war housing of Wyandotte, Lincoln Park, River Rouge, Ecorse and the Detroit neighborhoods along our boundary, interior demolition produces plaster rather than drywall — and plaster is dramatically heavier for the same wall area. A room that would fill a quarter of a 20 yard in drywall can hit the weight allowance in plaster.
Tile and mortar bed behaves the same way. Older bathrooms here often have a mortar bed under the tile, which weighs several times what a modern tile-on-backer installation does.
For all of these, you get volume through swaps, not through a bigger container.
Older buildings and asbestos
This matters more here than in most markets because of the age profile of the housing.
Our service area spans pre-war inner-ring housing through the enormous post-war build-out, which means a very large share of the building stock predates 1980.
In any building of that age, have floor tile, pipe lagging and insulation, siding, roofing felt and textured ceilings tested before demolition begins. Asbestos-containing material never goes in a container, and discovering it mid-demolition is far more expensive and disruptive than testing for it first.
Demolition permits in many municipalities carry their own survey conditions, so this is often a requirement rather than a precaution. Your municipality is the authority.
Job-site setup that saves money
- Place containers where the work is, not where they are convenient for the truck. Labor spent walking debris across a site is the largest hidden cost in waste handling.
- Run a separate 10 yard for concrete and plaster on any job producing real quantities.
- Start a metal pile immediately. On an older building the cast iron alone justifies it.
- Set up a cardboard point by the trades' entrance from day one.
- Keep treated timber out of any clean wood or green load.
- Brief every trade on day one and again when a new crew arrives. One subcontractor can contaminate a stream.
- Check the overhead before the trades arrive — twenty-two feet, and the canopy here is low in places.
- Cover the container on a long placement. Rain and snow are weight you pay for, and an open container in a Michigan winter can take on a surprising amount of both.
Scheduling around the trades
On a phased job the container schedule should follow the trade sequence rather than sitting through the whole project.
A typical renovation runs: strip-out first, the heaviest and dirtiest phase, wanting a container on site continuously; then framing and mechanical, producing steady moderate volume plus the metal stream; then finishes, producing packaging and offcuts in bursts.
Three shorter placements timed to those phases usually cost less than one long one and keep the site clearer. Tell us the build program and we will schedule around it rather than making you call each time.
Winter on a Michigan job site
Worth planning for rather than discovering.
- Snow and ice are weight. An open container left through a storm can gain a meaningful fraction of its allowance in water. Ask for a cover on long placements.
- Frozen loads are genuinely harder to tip, and a container that has frozen to the ground is a problem at collection. Boards help; so does telling us the surface.
- Driveways narrow. Snow banks take a foot off each side, which can turn a workable 20 yard placement into a 15 yard one.
- Access on a slope changes. A loaded roll-off on ice is not something to improvise, and we would rather move a date than damage a driveway.
- Trades lose days, so build slack into a January or February program and book the rental period to match rather than paying extensions.
None of that is a reason to avoid winter work — plenty of interior renovation is best done then. It is a reason to say so at booking.